CURRENT: Eighty-meter long elevated driveway; hardwood decking on steel undercarriage in cement footings on a hillside, Hatillo, Costa Rica
RECENT 1: Raw concrete work on a worker's home as part of a sprawling residential complex on the Osa, finish scheduled per owner's requirements for dry season, 2011: Miramar, Osa Peninsula.
RECENT 2: Water capture tank and system and deployment of electrical and plumbing lines on subcontract from Osa Power and Water to support the residential complex under construction in Hatillo, Costa Rica
RECENT 3: Water capture tank on subcontract from Osa Power and Water for a 180 hectare silvicultural farm near Palmichal de Acosta.
RECENT 4: Rainfall capture system for a Manuel Antonio commercial hotel under subcontract from Osa Power and Water.
MID 1: Construction of the first cabin set at Laguna Vista Villas, Carate, Costa Rica
MID 2: Package plant fabrication/installation of commercial hotel wastewater system, XXXX, Jacó
MID 3: Installation of a water supply main tank and distribution main for the Parragon residential development project, Parrita.
ANCIENT: Resbalosa